FRAMING, continued |
|
9/28/08 - It turns out that John Blais did a whole lot more than just squaring off the ends of the planks. He actually assembled four, 12-foot sections of the east wall in his garage! John, Chris Dickson, Bob Stickney, and Sam Stickney loaded the sections onto a trailer and transported them in the rain to the building site. Thanks go to Chris Dickson for letting John use his power nailer. |
|
|
|
The assembled wall sections await the
Monday morning crew. |
|
9/29/08
- By noontime Monday, the east wall was up and braced. |
|
![]() |
|
Gene and Tom |
|
![]() |
![]() |
Gene, Tom, and Bob work on the south wall. |
Bob, Tom, Gene, and Fern put up a section of the
north wall. |
By 3 o'clock quitting time, the groomer garage is really starting to take shape! |
|
![]() |
|
9/30/08
- Today, the headers above the overhead doors get put in. |
|
![]() |
|
Bob Milligan brings lumber inside in preparation for building the overhead door headers. |
|
![]() |
|
Bob Milligan and Gene Knox are on the staging. Below are Tom Reed, Fern Dumoulin and Ivan Arsenault. |
|
![]() |
|
At midday, the Advantec sheathing arrives
in time for the next phase of construction. |
|